When I had some free evenings and paint was drying in various portions of the two modules, I also dug out some tank kits that I had accumulated for the mill and began to build them. And of course, all tanks should be set inside some sort of spill containment structure, so I have also been rummaging through the scrap styrene box to fine appropriately sized pieces to build containment structures. My recent work has been to start adding some pumps and piping; I found some great HO sized pumps on the Shapeways website and will be adding pumps and piping shortly.
Initial construction; still need to add piping to each of the three tanks as well as the 3 tanks in the background |
Bldg is now partially done; major components are in place, however, work still needed for the piping and exits along the left side of the Bldg |
Windows still need to be worked on and some sort of backing put into place so that the windows and styrene don't deflect and bow; many of the pieces used are leftovers from other projects |
Working through some of the details |
Additionally, I have been able to ballast most of the track in the paper mill, as well as setting the switches permanently.