Wednesday - ONR Convention T-2 Days
This blog starts the travels of two Ohio railfans and one Niagara Falls fan as we head northward for the 2017 convention. We start our trip early, let's just say 0-dark early on Wednesday. Bram departs his Vermilion home at just about 0001 Wednesday and picks me up on the eastern side of Cleveland shortly after 0100. A quick load of the Prius and were headed east towards Buffalo and then Niagara Falls. Bill Woods joins us at about 0430 from his home in Niagara Falls and we're again headed towards the traffic of Toronto and destinations northward. Luckily even though the traffic is heavy, we sneak past all of those busy commuters as the Prius hugs the HOV lane and we hit the 400 northward just around 0600. A quick bite at the McD in Barrie and we're again in the car and headed towards Washago and our first and really only train of the day. Green light showing at Washago, although very overcast and no real shot to be had between the clouds and the overgrowth. So we we watch CN 3101, a long stack train, rumble through on its way southward before we're back and heading north on Rt. 11.
A bit of a stop at Bracebridge for Bram to shoot some of the downtown businesses, the location of the old station and and old industry location. All are for reference purposes and Bram will be glad to tell all of his new expansion plans for the layout.
Another stop at the former CP station and now hobby store in North Bay to admire all of the products on display before we make a quick lunch stop and head towards Englehart. Of course, another stop is needed in Temagami to check out the station and art display that's on hand. Unfortunately the Bee appears to be permanently closed, so it's a good thing we grabbed lunch in North Bay.
Unfortunately our arrival in Englehart by mid-afternoon sees us finding no trains or action. However, the 701 steam engine is looking fantastic since the last time I saw her, complete with new paint job. After walking around and shooting some photos of log cars, we find an ONR employee who tells us that the Rouyn-Norando train should be headed back later in the afternoon. So we adapt and check into the motel and grab some Subway before heading to Kirkwood Lake and a previously done photo stop just at the Ontario-Quebec line. After 90 minutes of so of battling the deer flies and lengthening shadows, we decide to call it and head back. A check of our string marker near the crossing by the hospital confirms that somehow we missed that train. It's been a long day, so we head back to the motel and shut-eye. Hopefully tomorrow will see us finding some rail action.
Wednesday, July 19, 2017
Monday, July 17, 2017
2017 ONRH&TS Convention Preview
Follow along as the guys from Ohio (plus one Niagara Falls attendee) make the trek to northern Ontario and this years version of the ONRH&TS convention. This blog will try to keep a running tab on railfanning and convention activities as we go through the week.
The Bailey Prius mobile departs Vermilion at 0001 dark Wednesday and travels eastward to pick me up around 0130 before we head towards the Peace Bridge and hopefully reach Toronto early enough to avoid the daily traffic snarls. Along the way we will add Bill Woods in Niagara Falls to our Prius seating and depending on what is moving, probably will spend the night in Englehart. A side trip to Bracebridge along the way may be in order if the weather cooperates, as Bram would like to get some building shots for a potential expansion project to the layout. But I'l let Bram fill you in on those plans at the convention. On Thursday we plan to chase our way to Hearst, making our arrival in time for the group dinner.
Current plans are:
Friday - tour the Cochrane shops
Satursday - tour the paper mill at Kap
Sunday/Monday - travel day home (although the OH car will be railfanning along the way so it takes us two days to get back)
Current plans are:
Friday - tour the Cochrane shops
Satursday - tour the paper mill at Kap
Sunday/Monday - travel day home (although the OH car will be railfanning along the way so it takes us two days to get back)
So stay tuned to this blog for updates and some photos. Photo bag is packed and batteries charged. Extra radio is also in the bag and ready to catch some ONR action. The weather forecast looks good and I'm really looking forward to touring the paper mill and maybe getting some new ideas so that I can finish my own paper mill modeling project.
Sunday, June 11, 2017
Passenger Service comes to the KLR
I have thought about adding an RDC to the KLR ever since they were first introduced by Rapido. But I held to my original thought that the KLR was simply too small a railroad to have need of such equipment. Well several weeks ago, after running on Bram Bailey's Ontario Central, I decided that I also needed at least one RDC. Bram has three OCR units running on a regular passenger train route, and those Rapido's just run so nicely that after hearing them spool up to speed, I was hooked.
After some Internet searching, I found someone in Indiana (of all places) selling a CP Rail RDC-1 at a decent price. The treasury of the KLR was able to come up with the money and the purchase was made. The unit arrived this week, and after a little break-in session and some tweaking of the DCC system, everything was working and the RDC has been placed into service. I'm still working on the details of its service, but for now it's going to function similar to what some of the RDCs used in British Columbia were used for. That is the transport of school children and workers. So until more details are worked through, the RDC will run in the early morning and late afternoon to transport everyone to Pembroke. These will be whistle stops and all are welcome to flag down the unit for pickup.
| RDC 9051 picks up passengers at the Peterborough station. |
| RDC 9051 begins to pass over Eels Creek on it's way to Pembroke |
Wednesday, January 18, 2017
First Operations in 2017
The first operations of 2017 occurred on the 2nd day of the new year and saw the KLR delivering some empty Thrall boxcars and woodchip gondola to the Muskoka Timber operations in Bracebridge, ON. Plant workers finished loading the order the last day of the year onto the centerbeam flatcar, just before the New Year's holiday kicked into gear. By mid-morning Tuesday, workers were ready to load another flatcar with finished lumber and were eagerly awaiting the arrival of KLR 1646, which consisted of two empty thrall boxcars and an empty wood chip gondola. The KLR made quick work of the pickup and drop and was headed back to the yard in time to catch some more holiday football games.
| Dropping its van, KLR 1646 begins to move empty thrall boxcars onto the loading track |
| While a truck driver bringing in a new set of trees waits to unload, KLR 1646 inches past the boiler house. |
| Having dropper two thrall boxcars for loading, engine 1646 begins to back an empty woodchip gondola onto the chipper track |
Saturday, December 24, 2016
Woodchip Gondolas - Part 1
This update has become the companion piece to my recent Almost Completed ...Saw Mill entry. While I had plenty of centerbeam hoppers to support the Muskoka Timber saw mill operation, one item I was lacking was an adequate number of woodchip cars. So over the Christmas break, I decided to dig into some unbuilt woodchip car kits which have been sitting on my build shelf for several years. I should stop here and point out that while the manufacturer called them wood chip cars, in Canadian railroad terms they are correctly identified as gondolas. The resin kits, manufactured by Alpine Railway Shops of Kettleby, Ontario, were marketed as being representative of rolling stock used by CN and BCR for saw mills and paper mills. The gons were to become lettered for the KLR and be used in shuttle service between the Muskoka Timber mill and the Spruce Falls Pulp & Paper mill complex.
Researching sites such as the Canadian Freight Car Gallery, it appears that National Steel Car built this particular gondola for the Algoma Central, Canadian National (CN 879250-879749, Built 1975) and Pacific Great Eastern (PGE 90001-90140, built 1970). The Algoma Central received two groups of these cars. The first group, comprising 90 cars numbered ACIS 1401-1490 was built and delivered in 1974. The second group, delivered in 1981, were the 23 cars of series AC 1501-1523. About half of the 1500-series cars were sold off to Newaygo Forest Products in the early 1990s when the mill at Mead closed in 1985; some of the others were sold to Westar Timber (WESX) in British Columbia. Both series of ACR cars were built with one solid end, and one end that is a door, hinged at the top, for unloading the car using a hydraulic ramp. The car is tilted on end and emptied much like a dump truck. These cars were acquired for service for Newaygo Forest Products, shipping chips from the mill at Mead on the Northern subdivision to pulp mills in the USA.
Cars similar or identical to the 1500 series were also built in the 1980s for Quebec-Ontario Paper (QOPX) and Euro-Can Pulp & Paper (EURX). The cars were 163 gross tons, with a 6,600 cubic foot-capacity, painted light green and numbered QOPX 100-204, with the reporting marks signifiying the Quebec & Ontario Paper Co. The cars were Leased from General Electric (GERSCO) by the Donohue Paper Company and used to service the newsprint mill in Thorold, ON, which received woodchips from northern Quebec and Ontario.
Woodchip cars were built as large pieces of rolling stock, due to the density and relative weight of the material that they were carrying. As you can imagine, woodchips are very light and don't really compact bery well, meaning that cars can be overfilled without reaching the cars rated capacity. Often loaded cars were tarped to help keep the contents from flying out of the rail car and to the surrounding landscape.
Researching sites such as the Canadian Freight Car Gallery, it appears that National Steel Car built this particular gondola for the Algoma Central, Canadian National (CN 879250-879749, Built 1975) and Pacific Great Eastern (PGE 90001-90140, built 1970). The Algoma Central received two groups of these cars. The first group, comprising 90 cars numbered ACIS 1401-1490 was built and delivered in 1974. The second group, delivered in 1981, were the 23 cars of series AC 1501-1523. About half of the 1500-series cars were sold off to Newaygo Forest Products in the early 1990s when the mill at Mead closed in 1985; some of the others were sold to Westar Timber (WESX) in British Columbia. Both series of ACR cars were built with one solid end, and one end that is a door, hinged at the top, for unloading the car using a hydraulic ramp. The car is tilted on end and emptied much like a dump truck. These cars were acquired for service for Newaygo Forest Products, shipping chips from the mill at Mead on the Northern subdivision to pulp mills in the USA.
![]() |
| Source: http://canadianfreightcargallery.caPhotographer: William Henderson , Location: Glen Valley, BC. Date: May 21, 2014 |
![]() |
| Source: http://canadianfreightcargallery.caPhotographer: George Widener |
Cars similar or identical to the 1500 series were also built in the 1980s for Quebec-Ontario Paper (QOPX) and Euro-Can Pulp & Paper (EURX). The cars were 163 gross tons, with a 6,600 cubic foot-capacity, painted light green and numbered QOPX 100-204, with the reporting marks signifiying the Quebec & Ontario Paper Co. The cars were Leased from General Electric (GERSCO) by the Donohue Paper Company and used to service the newsprint mill in Thorold, ON, which received woodchips from northern Quebec and Ontario.
Woodchip cars were built as large pieces of rolling stock, due to the density and relative weight of the material that they were carrying. As you can imagine, woodchips are very light and don't really compact bery well, meaning that cars can be overfilled without reaching the cars rated capacity. Often loaded cars were tarped to help keep the contents from flying out of the rail car and to the surrounding landscape.
Saturday, December 17, 2016
Pine Trees
In keeping with the holiday spirit, I decided to sit down and create some trees for the layout, specifically some pine trees. Several years ago, I acquired three boxes of Campbell Scale Model trees that a gentleman approached me about trading for several Athearn blue box kits that I had listed for sale. I knew nothing about these trees except that they came five to a box, with all of the materials supplied in the box. I couldn't recall seeing these at any shows, but decided to go ahead with the trade anyway based on the reputation Campbell has for kits. So the kits arrived and I promptly placed them on nthe modeling shelf of projects to build down the road.
I needed some evergreen trees for a corner of the layout and decided to start building my first pine tree. The first thing I noticed was that the pine tree "sticks" were much larger than I had anticipated and larger than any other pine tree that I have on the layout. I think that the trees are more in keeping with some western pines this week, however, as I'm going to place them in a corner and they won't be a focal part of the scene, I'm hoping that they don't stand out too much.
The foliage consists of two bags of what I believe to be air ferns. Air fern has a delicate, airy structure as the name implies and is available through florists or garden centers. The truck of the tree consists of a pre-stained wooden dowel, with pre-drilled tiny holes in the trunk of the tree. So it's a simple matter to insert the air fern branches cut to shape into the hole after a small amount of white glue is placed on the trunk. Branches can be re-trimmed with an X-Acto knife or scissors as you build your tree, and most branches need some amount of trimming as the air fern seems to twist quite a bit.
I'm very pleased with the results to date. Each tree takes about an hour to construct and trim. My only complaint is that whatever the air fern has been treated with, or maybe it's naturally like this, the smell tends to become annoying after about 30 minutes of working with them. It's some sort of moldy type of smell that I find to be distasteful. Fortunately the result is worth the temporary annoyance
Next step is to "plant" my trees.
I needed some evergreen trees for a corner of the layout and decided to start building my first pine tree. The first thing I noticed was that the pine tree "sticks" were much larger than I had anticipated and larger than any other pine tree that I have on the layout. I think that the trees are more in keeping with some western pines this week, however, as I'm going to place them in a corner and they won't be a focal part of the scene, I'm hoping that they don't stand out too much.
The foliage consists of two bags of what I believe to be air ferns. Air fern has a delicate, airy structure as the name implies and is available through florists or garden centers. The truck of the tree consists of a pre-stained wooden dowel, with pre-drilled tiny holes in the trunk of the tree. So it's a simple matter to insert the air fern branches cut to shape into the hole after a small amount of white glue is placed on the trunk. Branches can be re-trimmed with an X-Acto knife or scissors as you build your tree, and most branches need some amount of trimming as the air fern seems to twist quite a bit.
I'm very pleased with the results to date. Each tree takes about an hour to construct and trim. My only complaint is that whatever the air fern has been treated with, or maybe it's naturally like this, the smell tends to become annoying after about 30 minutes of working with them. It's some sort of moldy type of smell that I find to be distasteful. Fortunately the result is worth the temporary annoyance
Next step is to "plant" my trees.
![]() |
| Initial tree materials. Sorry for all of the background clutter but it's my active work bench. |
![]() |
| Completed treet |
![]() |
| Close up of the branch structure |
Monday, November 28, 2016
Addressing a Lingering Mistake - Part 1
As I mentioned in an earlier post, I had the opportunity to
be part of the LDSIG tour during the 2014 NMRA National Convention held in
Cleveland, OH. As part of the tour,
layout owners were asked to report on what they would have done differently
during a discussion session after the tours.
While I didn't have the opportunity to participate in the discussion
directly, it did get me thinking or maybe it actually solidified some thoughts
I had been having while constructing and operating the KLR. One of the last things that I wanted to admit
was that my design on the south wall of the layout had to sharp a curve in
place. Sure it could handle 40 and 50 ft
boxcars OK, but I knew that I would be running some larger woodchip cars and centerbeam flatcars, as well as the daily passenger train. However, I didn't have a
yard in this area as yet, so I kept telling myself it was OK and never tested the curve with larger equipment. However, fast forward to present day and the small staging yard is complete,
connections made to the adjoining track and I've been running trains. Well, I thought I was running trains until I
tried some of my longer cars, including my nice Rapido passenger cars. So tonight I bit the bullet after many weeks
of thought as to what I could do. Maybe it was trying to run my passenger train
through the curve that finally got me to act.
So instead of the barely 22 degree curve that was in place, I opted to
rip out track and scenery to accommodate a 30 degree curve. The choice of the 32 deg was based on this
was about the smallest curve I could handle without a major reconstruction of
the model and use some of the existing trackage nearby to reasonably make a
connection.
Ripping out the scenery from two modules was sort of
bittersweet. I never really liked that corner, something always bugged me about
the scenery. While I liked the rock outcroppings in the background, the lack of
any clear way to get to the N scale cabin that I had placed there bugged
me. So with my handy multi-purpose tool
and hammer, I removed everything to the base foam layer. Boy was that hydrocal
that was used tough to remove. Even the adhesive glue I used back then was
tough to remove, as pieces just didn't want to come off. But an hours work, and
here's the result, a new canvas to work with. I was able to save all of the
rock outcrops, as I had built them to be removable.
Next to be modified was the old Eel's Creek module, which is actually the
lead to the curve. In order to accomodate the change in track radius, I needed to add some new real estate and the only way to do so was to modify the bridge and surrounding scenery. I had originally used a resin material to create the water, and while
the effect was good, it was never really deep enough and I wasn't quite
satisfied with the bank edges. So it had
to go too, which was no big loss, although I did try to save the bridge piers to no avail.
Prototype bridge over the Otonabee River
Not to bore you with the details, but here's a
quick recap of what changed after the tear-out was completed:
- Increased
the track radius to 30 deg
- Re-shaped
the topography of the western bank of Eels Creek
- Carved
a new river channel
- Added
a new river base via adding several coats of ModPodge
- Added
a new bridge section
- Re-routed
my track as it came to the creek and immediately after the
bridge
- Ripped
out the area behind the curve; the final scene in this area as yet to be
determined
- Added
many more rock castings
Most important thing, the curve now accommodates
larger rail cars although it still is a fairly sharp curve.
Loon Lake Country Store
One of my summer projects was to work on the placement of
buildings and roads in the town of Pembroke, Ontario. Pembroke is my only
real town, but that I mean other industries are located in various spots on the
layout and represent actual town or city locations, but I have made a conscious
effort not to include any other buildings than the industry itself. My other
towns are simply depicted by photo backdrops. For a review of Pembroke,
see my earlier discussion in a posting entitled Modeling Pembroke.
Uncoupler Tools - a modification worth stealing
I’ve
had the chance to operate on layouts which used both magnetic uncouplers as
well as some sort of physical uncoupling tool.
For my money, a simple and cheap tool is better than investing in
pre-made plastic or metal tools, or installing magnetic uncouplers in multiple spots. A wooden skewer, poked between the couplers
and twisted to uncouple your cars, is the easiest, simplest and cheapest method
available in my opinion. Wooden skewers are easy to pickup at the grocery or craft store, cheap (my
bag of 100+ cost a little less than a dollar), easy to use, and if someone accidentally walks off with your uncoupling tool, you have an entire bag still waiting
for you.
The
other advantage I found with wooden skewers is that they are long enough to
make it easier to work with and they are cheap. I can locate them all
around the layout so there's always one within easy reach, and if one gets
damaged I don't care if it needs to be discarded and replaced.
Recently
I was watching a YouTube video of an operating sessions and I noticed that the
Bamboo skewer was enhanced with a Twist-on wire connector screwed onto the blunt
end. This allows for better grip. In order to keep the wire connector from accidentally falling off and onto your layout, I simply fill the cap with hot glue and twist it onto the skewer, thereby making it a permanent attachment. The cost for the caps, about $1.50 for 14 at the local hardware store.
Almost Completed ...Sawmill Module
| View looking towards the log conveyor. This will be where trucks are unloaded and logs placed into the yard or onto the conveyor. |
Week 2 - all structures built and painted, now comes the time to test fit them into place. I usually like to place buildings and look at the potential rail traffic patterns for off-loading as well as truck movement on the scene. After several nights of looking at buildings and just not happy with their placement, I decided to consult some photos I had taken from Bob Mitchell's Algoma Central layout from this years HOMES tour in Hamilton, ON. Bob's scene is similar to mine, as it is located at the end of his layout room and takes up a far amount of space along his wall. I'm not sure what the length of his scene actually is, but it's a little deeper than my module, as he has a mainline running behind it.
Week 3 - opted to remove the log pond and tepee burner due to space restrictions. I had roughed both of these features into the scene but decided that they just were too much clutter. Decided that the space previously occupied by my control tower could be altered to hold the wood chip truck equipment. This means ripping up all of the previous scenery and starting new.
Week 4 - home stretch. Buildings are in place and completed installing the concrete pavement around the planer building, including the truck loading area. Began to weather the rooflines of all buildings with Pan Pastels. Installed piping runs from the planning mill building out to the sawdust collector for rail and truck. Scavenged the back yard for small pieces of branches, which will become my log piles. Still need to place the workers, cut dozens and dozens of twigs to represent the logs and then add some of the smaller detail parts. But that's another day when the snow is flying and I have a few evenings to catch up. Now it's on to the Niagara Distribution and paper mill modules for some intensive work. Maybe hold an operating session or two to check my car card system.
Tuesday, August 2, 2016
Modeling Pembroke
I chose to model the city of Pembroke, Ontario on my Kawartha Lakes Railway, although like many modelers, I have taken many liberties for the town. Essentially Pembroke is within the Ottawa River valley, which was a convenient way to allow the KLR to head northward and then turn to the west so that it could interchange with the Ontario Northland. For my time period, this would actually have been the domain of CP Rail, as it followed the southern shores of the Ottawa River. However, the location fit in for modeling purposes, and it was similar to several of my local towns that I have spent my summers visiting.
So when I say I chose to model Pembroke, I really mean that I chose to transport local businesses from all over Ontario into the Pembroke area. I wasn't striving to make true to life buildings, rather take the existing businesses that I found to be interesting or unique and fit them to a readily available kit. I have some typical businesses, like Home Hardware and a book store, to unique stores such as Cahill's Furrier and the McKenzie Brew Pub.
My thanks to fellow modeler and friend Dale Photo, who helped me out a few years ago by taking some of my DPM building that I had assembled but never got around to painting, weathering or even placing roofs on the structures. I convinced Dale that when the 2014 NMRA Convention was scheduled for Cleveland, that I could use his help with getting some structures ready. So he did a lot of painting, some window and roof installations for me, enough to make the layout a little more presentable. During the summer of 2016, I decided to get busy with installing windows, lighting, signage and other details.
Most of the signs you see on the buildings come from searching the Internet for company logos and signs. All have been printed on a color laser printer. In some cases, such as the radio station ad on the McKenzie building, decals have been used. Ultimately each of the signs and buildings will be weathered to age them. Lighting has been added using the Woodland Scenics Just Plug hardware (see previous posting for my review).
So when I say I chose to model Pembroke, I really mean that I chose to transport local businesses from all over Ontario into the Pembroke area. I wasn't striving to make true to life buildings, rather take the existing businesses that I found to be interesting or unique and fit them to a readily available kit. I have some typical businesses, like Home Hardware and a book store, to unique stores such as Cahill's Furrier and the McKenzie Brew Pub.
My thanks to fellow modeler and friend Dale Photo, who helped me out a few years ago by taking some of my DPM building that I had assembled but never got around to painting, weathering or even placing roofs on the structures. I convinced Dale that when the 2014 NMRA Convention was scheduled for Cleveland, that I could use his help with getting some structures ready. So he did a lot of painting, some window and roof installations for me, enough to make the layout a little more presentable. During the summer of 2016, I decided to get busy with installing windows, lighting, signage and other details.
Most of the signs you see on the buildings come from searching the Internet for company logos and signs. All have been printed on a color laser printer. In some cases, such as the radio station ad on the McKenzie building, decals have been used. Ultimately each of the signs and buildings will be weathered to age them. Lighting has been added using the Woodland Scenics Just Plug hardware (see previous posting for my review).
| Strange Brew...the McKenzie Brothers Bar & Grill. Still waiting for a bar, tables, etc; also waiting for the beer which comes from the McKenzie Brewery via Bram Bailey's Ontario Central Railway |
| There actually is a books n' things in downtown Peterborough. One of my favorite visits for some summertime reading |
| Fashioned after Whetung's General Store at Crowe's Landing on Upper Stoney Lake; really liked the kit and needed to capture the spirit of the common look which makes it's home on Stoney |
| Home Hardware Bldg - you can find these in every Ontario town of any size. First task is to modify the lighting and add an interior |
Sunday, July 31, 2016
Product Review - Woodland Scenics Just Plug System
I decided to add some electrification to the town of Pembroke in order to give it a little life. Originally, none of my buildings have had lighting, and in fact, the only lighting was provided by a couple of street lamps I had picked up years ago and mounted to the scale sidewalk. So when Woodland Scenics introduced their Just Plug system, I was intrigued and anxiously waited for it to hit my local hobby store. It looked like a simple process to light and building, and was basically a plug and play type of hardware. Fast forward to present day, when I finally opted to make the purchase. So after designing my electrical network and determining how many Light Hubs, individual lights, etc., I was ready to place my order.
Opened the mailbox Friday to find that two packages had arrived containing each of my new purchases. So I quickly got to work that evening and began the installation process. Ten minutes into it, I found my first real problem with the system. After looking at the supplied instructions and going back to their web page, I realized that no where can you find the size of the drill bit or hole size you are going to need to pass the connector pin through the layout and underneath to the awaiting Light Hub. By the way, it requires a 3/8-inch drill bit. The light itself is fairly large (approximately 3/8-inch squared), which is actually good for giving more illumination, but the pin at the other end of the wire is roughly the same size as the light. Unfortunately the instructions are not the best and no way to see this before you purchase. Grade = C-
So for any existing structures without a removable floor or roof, you need to create a mega hole cut into your nice expensive structure. Fortunately, each of my buildings have been built from scratch or kit and I left space to mount a floor at a later date, when I will install detailed interiors. Of course you could always try to cut off some of the wiring, run the two thin wires through a small hole and reattach them to the light but this sot of defeats the idea of plug and play. Grade D+
So after drilling my mega-sized hole and attaching the light to the building, as well as mounting the Light Hub to the underframe of the layout, I realized that the connector pin actually mounts to the top of the Hub, not the underside of the box. So you need nimble fingers to press the connections into the box when your box is actually mounted high on the side frame so that it is out of sight. We are model railroaders aren't we, and used to small wires and small spaces. Perhaps Woodland Scenics will engineer and top vs bottom connection in the next version. Grade C+
It's probably just me, but I feel like the connection plug is very flimsy and just a little bit of extra force will break it and the delicate wires inside. I have no confidence that if I ever want to remove the wiring plug that I'll be able to do so, as the connection os so tight. Grade C
Pricing....the system isn't cheap but is affordable for the average hobbyist if you plan well. The simplest system requires a Light Hub, power supply (can be DC) and lights. So you have roughly $45-50 easily invested. Through in multiple Light Hubs and you'll need an Expansion Hub as well. My biggest problem is that individual lights are about $4.50-5.00 each and only sold two per package. I think that WS is making a huge profit here and would have preferred that they offer a package with a minimum of 4 or 8 units with a price of may maybe $2-3 per unit. Throw in the cost of the building light diffusing kit and some extension wiring to reach those distant spaces away from your hubs, and you see that the price creeps higher and higher quickly.Wait we haven't thrown in the cost of the individual street lights yet.
Overall I like the system and the plug and play concept. I'm really looking forward to installing some street lamps. Unfortunately I think that it does have some shortcomings and the price is slightly on the steep side. Overall grade = C.
Opened the mailbox Friday to find that two packages had arrived containing each of my new purchases. So I quickly got to work that evening and began the installation process. Ten minutes into it, I found my first real problem with the system. After looking at the supplied instructions and going back to their web page, I realized that no where can you find the size of the drill bit or hole size you are going to need to pass the connector pin through the layout and underneath to the awaiting Light Hub. By the way, it requires a 3/8-inch drill bit. The light itself is fairly large (approximately 3/8-inch squared), which is actually good for giving more illumination, but the pin at the other end of the wire is roughly the same size as the light. Unfortunately the instructions are not the best and no way to see this before you purchase. Grade = C-
So after drilling my mega-sized hole and attaching the light to the building, as well as mounting the Light Hub to the underframe of the layout, I realized that the connector pin actually mounts to the top of the Hub, not the underside of the box. So you need nimble fingers to press the connections into the box when your box is actually mounted high on the side frame so that it is out of sight. We are model railroaders aren't we, and used to small wires and small spaces. Perhaps Woodland Scenics will engineer and top vs bottom connection in the next version. Grade C+
| Plug in front and pass through hole above "dg" in Bldg |
| Light Hub - tough to place wire/plug into hole when you can't see the receiver top |
Once all of the lights were installed, I will say that the system nicely lights up the scene and the little bulbs are very powerful. The dimmable bulbs is also a nice feature, although I found that that controls between Light Hubs were a little quirky and not as sensitive as I would have liked. Still trying to figure out why adjusting one dimmer results in the next door dimmer have momentary lapses and losing power. Grade A-
| Full brightness with the diffuser screen in place |
| Lights dimmed, still with diffuser screen in place |
Pricing....the system isn't cheap but is affordable for the average hobbyist if you plan well. The simplest system requires a Light Hub, power supply (can be DC) and lights. So you have roughly $45-50 easily invested. Through in multiple Light Hubs and you'll need an Expansion Hub as well. My biggest problem is that individual lights are about $4.50-5.00 each and only sold two per package. I think that WS is making a huge profit here and would have preferred that they offer a package with a minimum of 4 or 8 units with a price of may maybe $2-3 per unit. Throw in the cost of the building light diffusing kit and some extension wiring to reach those distant spaces away from your hubs, and you see that the price creeps higher and higher quickly.Wait we haven't thrown in the cost of the individual street lights yet.
| Lighting attached to ceiling of first floor |
Sunday, July 3, 2016
Summer Ops Session
Like many model railroaders, I tend to work on small, isolated projects during the summer if I can find some free time. I usually try to finishup any large projects for the KLR in early May, as I know that my time becomes spent more and more with yard work, maybe some railfanning and other summertime recreational activities. By about the 1st of June, engines have been put away and I start making a list of upcoming projects that I'll start as soon as the cooler months roll around.
However, one of my local friends now finds himself splitting his time between northeast Ohio in the late spring to early fall, and Arizona the remaining months. Before his move, op sessions on the Ontario Central were held at various times throughout the year. Now the op sessions are once per month, starting in June. While it may not be the traditional time for operating a model railroad layout, it does make for a nice diversion from yard work. The last op session I attended was very small in attendance, with only one other regular operator present. However, it turned out to be a great session, as we were both able to run our trains and we simply did away with a time clock.
I chose the paper mill turn, which is a train I have run before. I really enjoy this train, as it gives me ideas on how I might switch out my own paper mill. It usually takes about 2.5-3 hours to get to the paper mill and do all of the switching. It's one of those jobs that keeps you very busy, and you don't actually realize the amount of time which has elapsed, as your having that much fine doing it. And isn't that what model railroading should be all about? So thanks Bram for holding the summer op sessions, and I look forward to the next one.
However, one of my local friends now finds himself splitting his time between northeast Ohio in the late spring to early fall, and Arizona the remaining months. Before his move, op sessions on the Ontario Central were held at various times throughout the year. Now the op sessions are once per month, starting in June. While it may not be the traditional time for operating a model railroad layout, it does make for a nice diversion from yard work. The last op session I attended was very small in attendance, with only one other regular operator present. However, it turned out to be a great session, as we were both able to run our trains and we simply did away with a time clock.
| Pulling loaded boxcars from the warehouse |
| Arrival of the paper mill turn...it's going to be a busy day for the crew |
I chose the paper mill turn, which is a train I have run before. I really enjoy this train, as it gives me ideas on how I might switch out my own paper mill. It usually takes about 2.5-3 hours to get to the paper mill and do all of the switching. It's one of those jobs that keeps you very busy, and you don't actually realize the amount of time which has elapsed, as your having that much fine doing it. And isn't that what model railroading should be all about? So thanks Bram for holding the summer op sessions, and I look forward to the next one.
Subscribe to:
Posts (Atom)






